Warning

 

Close

Confirm Action

Are you sure you wish to do this?

Confirm Cancel
BCM
User Panel

Arrow Left Previous Page
Page / 2
Posted: 12/7/2018 3:05:36 PM EDT
[Last Edit: BigWaylon]
Link Posted: 12/7/2018 8:17:41 PM EDT
[Last Edit: BigWaylon] [#1]
deleted
Link Posted: 12/7/2018 10:31:39 PM EDT
[Last Edit: DK-Prof] [#2]
Link Posted: 12/8/2018 6:06:03 AM EDT
[Last Edit: Seattle206] [#3]
Type: Form 1 Paper via Trust x1 RP
Mailed: 8/27/2018
Pending: 9/6/2018
Approved: 12/4/2018
Received in Mail: 12/17/2018
State: WA
Link Posted: 12/8/2018 12:24:14 PM EDT
[#4]
Trust Paper Form 1, one RP.

Mailed 6/5/2018
Check cashed 6/21/2018
Approved 11/8/2018
Received stamp 11/19/2018

A bit over 5 months.
Link Posted: 12/8/2018 6:44:38 PM EDT
[#5]
Individual Form 1 Paper (Through Silencer Shop)

Submitted 7/24/18
Check Cashed 8/1/18
Approved 11/27/18
Received 12/4/18
Link Posted: 12/8/2018 10:51:47 PM EDT
[Last Edit: prebans] [#6]
Individual paper Form 1 for a DD.

F1 submitted 08/24/2018.
Don't know the date the check was cashed.
Approved 11/26/2018
Received while I was out of town, so I don't know the day the approved form arrived.

That's 92 days counting the Labor Day, Columbus Day, Veterans Day, and Thanksgiving federal holidays.  Not bad!
Link Posted: 12/10/2018 11:12:52 PM EDT
[#7]
IF1 through SS

Submitted 7-13
Received 12-6 (that's when I checked the mail.  Only do so about once every two weeks)
Link Posted: 12/11/2018 4:03:09 AM EDT
[#8]
Form 1 individual SBR through SS
Submitted 8/29/18
Check cashed 9/7/18
Approved 11/29/18
Received 12/10/18

3 months
Link Posted: 12/11/2018 6:50:19 PM EDT
[#9]
Form 1 SBR - Colt 6920, 10.3"

Individual
Forms Sent 9/11/2018
Check Cashed 9/21/2018
Form Approved 12/4/2018
Form Arrived 12/11/2018

74 Days

This is a big one for me, as it's my first AR-15 that is an SBR.
Link Posted: 12/12/2018 7:52:42 AM EDT
[Last Edit: BigWaylon] [#10]
Deleted per Rule #4
Link Posted: 12/12/2018 10:28:43 AM EDT
[Last Edit: inop] [#11]
SS form 1 service 7/5/18
Check cashed 7/25/18
Pending 7/27/18
Approved 11/29/18
In hand 12/14/18
Link Posted: 12/12/2018 10:46:20 AM EDT
[Last Edit: stanprophet09] [#12]
Form 1 Suppressor Idividual

Form mailed   07/12/18

Card chargerd 07/19/18

Pending 07/23/18

Approved 12/04/18

134 days from In the system to approved.
Link Posted: 12/12/2018 6:25:40 PM EDT
[Last Edit: fr3d] [#13]
F1 SBR individual through SS

Ordered: 20180831
Check cashed: 20180922
Approved: 20181206
Received: 20181212

I almost pitched it with junk mail
Link Posted: 12/13/2018 1:39:08 PM EDT
[Last Edit: Rob21SF] [#14]
Trust Paper Form 1, SBR

Mailed 7/25/18
Resumbitted due to error: 8/17/18
Check cashed 8/28/18
Pending: 8/28/18
Approved: 12/13/18
Received stamp:12/20/18
Link Posted: 12/14/2018 4:51:10 PM EDT
[#15]
Form 1 Truse with 2 RP through Silencer Shop

Cashed:  7/21/18
Approved: 11/29/18
Received:  12/14/18
Link Posted: 12/15/2018 7:39:31 AM EDT
[#16]
Form 1
Individual Paper
Silencer Shop Submission
Submitted 9-5-18
Approved 12-4-18
Link Posted: 12/15/2018 8:35:58 AM EDT
[#17]
SS form 1 service, Trust 1 RP

Check cashed 7/9/18
Approved 12/3/18
Received 12/14/18
Link Posted: 12/15/2018 11:17:34 AM EDT
[#18]
SS F1 SBR using trust
Purchased SS F1 service 7-19-18
SS Compliance approval and ATF submission 7-30-18
ATF approval 12-4-2018
USPS delivered F1 and stamp 12-14-2018
Link Posted: 12/15/2018 9:46:08 PM EDT
[#19]
Trust and Paper Form 1 for SBR, via SS. Three RPs.

Ordered 08/24/2018
Check cashed 9/8/2018
Approved 12/4/2018
Received stamp in mail 12/15/2018
Link Posted: 12/17/2018 9:53:05 AM EDT
[#20]
Paper form 1 submitted 9/5
Approved 12/4
Form arrived in mail 12/15

Color me impressed
Link Posted: 12/17/2018 12:22:20 PM EDT
[Last Edit: bigbear_98] [#21]
Form 1 Trust SBR
filled out and mailed 8/17/18
Received/Replied to an email about needing a new signature 11/27/18
Approved 12/4/18
Arrived 12/15/18
~4 months
Link Posted: 12/18/2018 1:02:25 AM EDT
[#22]
Form 1 for an SBR
Four (4) responsible parties
Mailed June 4, 2018
CC processed June 6, 2018
-hurry up and wait-
Called NFA Branch December 14, 2018 and was told it was approved December 10
Stamp received December 17, 2018

Just over six months.
Link Posted: 12/18/2018 3:03:29 PM EDT
[#23]
Silencer Shop F1 - SBR

Trust - 2 RP

AMD-65

Check Cashed - 9/19/18
Stamp Approved -  12/13/18
Stamp Received - 12/17/18
Link Posted: 12/24/2018 6:41:19 PM EDT
[Last Edit: bestiller] [#24]
3 Form 1’s Individual all for SBR’s

Mailed: 6/17/18

Checks Cashed: 7/24/18

All Approved: 12/18/18

Received: 12/24/18

189 days mailbox to mailbox

Examiner: BAPALMER
Link Posted: 12/25/2018 1:04:02 AM EDT
[Last Edit: snakeman48] [#25]
Paper form 1 through Silencer Shop for SBR

SS submitted:  07/10/2018
Check Cashed: 07/24/2018
Approved: 12/01/2018
Received:  12/15/2108

Examiner:  KJRowland

I still have a SS paper form 4 from May 15th that haven't received yet.
Link Posted: 12/25/2018 1:22:35 AM EDT
[#26]
X3 F1 Ind
Check cashed 12 Sept 18
Approved 9 Dec 18
In hand 22 Dec 18
Link Posted: 12/26/2018 2:36:05 PM EDT
[#27]
Individual Form 1 Paper

Submitted 9/13/18
Check Cashed 9/18/18
Approved 12/18/18
Received 12/24/18

Merry Christmas to me.  
Link Posted: 12/26/2018 6:34:11 PM EDT
[#28]
x1 F1 Ind
Check cashed 12 Sept 18
Approved 18 Dec 18
In hand 26 Dec 18
Link Posted: 3/5/2019 12:27:00 PM EDT
[#29]
Silencer Shop single shot trust, paper form 1(sbr)

Signed  3/30/18
Cashed 4/19/18
Stamp Approved 2/21/19
In hand 3/2/19
Link Posted: 3/5/2019 12:29:58 PM EDT
[Last Edit: BigWaylon] [#30]
Link Posted: 3/18/2019 10:02:15 PM EDT
[Last Edit: BigWaylon] [#31]
Deleted per Rule #4
Link Posted: 3/20/2019 2:21:01 PM EDT
[Last Edit: Evil_Ed] [#32]
Form 1, SBR, Individual

Form sent:May 16 2018

Check cashed: May 29 2018

Approved: Mar 16 2019

Stamp received: Mar 22 2019
Link Posted: 3/25/2019 4:08:01 PM EDT
[Last Edit: BigWaylon] [#33]
Deleted per Rule #4
Link Posted: 5/18/2019 4:23:24 PM EDT
[#34]
Paper form 1
Trust, 1 RP
Sent 8/17/18
Approved 5/7/19
Link Posted: 5/26/2019 7:36:14 PM EDT
[#35]
Trust Paper Form 1 - SilencerShop Service

Responsible Persons: 1
Purchased Service: 04-23-18
Final Documents Signed: 05-14-18
Mailed: ???
Check Cashed: 06-04-18
Approved: 05-16-19
Stamp Received: 05-26-19

Round Trip: 1 Year + 1 Month + 4 Days

Alternative Measures

34,473,600 seconds

574,560 minutes

9576 hours

399 days

57 weeks

109.32% of a common year (365 days)[/li]
Link Posted: 5/28/2019 3:26:11 PM EDT
[Last Edit: DickDanger] [#36]
Wrong thread
Link Posted: 6/12/2019 10:29:42 AM EDT
[#37]
Form 1 - Trust with 4 RP

Submitted: 9/12/2018
Check Cashed: 10/2/2018
Approved: 5/28/2019
Link Posted: 6/12/2019 4:20:00 PM EDT
[#38]
2x Form 1, both SBR's, Individual

Form sent: 11/10/18
Check cashed: 11/19/18
Approved: 5/29/19
Stamp received: 6/11/19

So 191 days from the check being cashed to approval.

I also had a Form 1 E-File approved on 5/28/19 (the day before) after only 13 days.
Link Posted: 6/12/2019 4:24:24 PM EDT
[#39]
Form 1 Trust

Went pending 10/1/2018
Approved 5/22/2019
Stamp in hand 6/3/2019

I sent this out just before the efile hit back up, and have since had 4 efile Form 1s approved all of which submitted in 2019.   I won't do another paper Form 1 as long as efile is up.
Link Posted: 6/17/2019 8:17:07 PM EDT
[Last Edit: Laruetn] [#40]
2 personal form 1's
Mailed on Nov 17, 2018
check cashed early Dec 2018
1 kicked back in April 2019  serial number verification
recieved both stamps today  June 17, 2019.

Seven months
Link Posted: 7/25/2019 12:05:42 PM EDT
[Last Edit: Jeep] [#41]
Form 1, Paper, SBR
Individual
Mailed 12/3/18
Approved 7/18/19
Received 7/25/19
Link Posted: 7/25/2019 8:58:49 PM EDT
[#42]
Link Posted: 7/29/2019 6:13:00 PM EDT
[#43]
Form 1, SBR, Individual

Submitted: 12/3/2018
Check cashed: 12/12/2018
Approved: 7/19/2019
Received: 7/29/2019

Submitted to Received = 7 months 26 days

The blue stamp is pretty, but I'm going to eFile next time.
Link Posted: 8/6/2019 1:35:51 PM EDT
[#44]
Form 1 paper - AOW.
Filled out paperwork 9/20/2018
Stamp received 8/6/2019
Link Posted: 8/11/2019 12:53:50 PM EDT
[#45]
Filled out and sent: 01/04/2019
Approved and mailed:  08/05/2019
Received @ my address:  08/10/2019

This was for 3
Link Posted: 8/19/2019 3:05:05 PM EDT
[Last Edit: Herzo] [#46]
Suppressor Form 1 mailed 2/4/19
Check cashed 2/8/19
Stamp Received 8/19/19
Link Posted: 8/30/2019 3:28:51 PM EDT
[#47]
Two Form 1s, filed as an individual.

SBS
Mailed February 14, 2019
Approved August 23, 2019

SBR
Mailed February 19, 2019
Approved August 25, 2019

Just over 6 months for each.

JMFRUSHOUR examiner for both.

Still waiting on the SBR mailed November 15, 2018
Link Posted: 8/30/2019 4:53:15 PM EDT
[Last Edit: BigWaylon] [#48]
Deleted...wrong thread
Link Posted: 9/1/2019 6:57:29 PM EDT
[Last Edit: BigWaylon] [#49]
Deleted
Link Posted: 9/27/2019 4:36:49 PM EDT
[Last Edit: Discblade] [#50]
Paper SBR Form 1 trust

Mailed 7-1-2019

Approved 9-20-2019

Received 9-27-2019

Trish Bartles, Examiner
Arrow Left Previous Page
Page / 2
Top Top