That's all we need.  I believe we will be sold out by our "republican" commissioners.  Get ready to have water shortages, massive electric utility costs and big brother in our backyard.

There is an estimated 100 million in new taxes that supposedly will be paid to the county by the globalist surveillance center.  I say the commissioners will sell us out.  Ill post any developments in this horror and any public hearings or demonstrations I become aware of.  Please do the same if you understand the risk.

https://www.tampabay.com/news/environment/2026/03/06/data-center-could-be-coming-greater-tampa-bay-area-locals-are-not-happy/
5/18/2026 7:10:27 PM EDT
[#1]
Now with more political fatigue.
5/18/2026 8:52:30 PM EDT
[Last Edit: wmagrush][Edited] [#2]
And wth Duke cutting local electric production by over 70% probably increased electric bills for residents as OP mentioned. Duke’s solar panel farm isn’t going to cut it, but somehow they will be tied into it getting more govt subsidies.

There is a ‘12 month temporary hold’ by the county commission to review the planned site.

And the St Pete Times link (original liberal newspaper’s name) wants money to read the article.
5/19/2026 7:20:17 AM EDT
[#3]
Originally Posted By Kalashnikov762:
That's all we need.  I believe we will be sold out by our "republican" commissioners.  Get ready to have water shortages, massive electric utility costs and big brother in our backyard.

There is an estimated 100 million in new taxes that supposedly will be paid to the county by the globalist surveillance center.  I say the commissioners will sell us out.  Ill post any developments in this horror and any public hearings or demonstrations I become aware of.  Please do the same if you understand the risk.

https://www.tampabay.com/news/environment/2026/03/06/data-center-could-be-coming-greater-tampa-bay-area-locals-are-not-happy/
View Quote
FL has been sold out for a while. We're California in the 1960s-1970s right now.
5/20/2026 12:15:10 PM EDT
[#4]
Quote History
Originally Posted By wmagrush:
And wth Duke cutting local electric production by over 70% probably increased electric bills for residents as OP mentioned. Duke’s solar panel farm isn’t going to cut it, but somehow they will be tied into it getting more govt subsidies.

There is a ‘12 month temporary hold’ by the county commission to review the planned site.

And the St Pete Times link (original liberal newspaper’s name) wants money to read the article.
View Quote

Try this one;

https://www.fox13news.com/news/citrus-county-residents-commissioners-battle-over-potential-data-center-holder
5/27/2026 3:23:53 PM EDT
[#5]
Why is it needed?  Esp in Holder area.  I guess they want to drain off the Withlacooche.  
Former E4 Mafia on multiple continents, retired FF/EMS/LE.
5/27/2026 8:24:30 PM EDT
[#6]
The question (excluding the obvious greasing the palms of land developers and politicians) is why not build it where three power plants were recently demolished?

Over four miles away from population, Gulf of America cooling water, an electrical grid already in place.
5/28/2026 9:56:50 AM EDT
[#7]
Quote History
Originally Posted By wmagrush:
The question (excluding the obvious greasing the palms of land developers and politicians) is why not build it where three power plants were recently demolished?

Over four miles away from population, Gulf of America cooling water, an electrical grid already in place.
View Quote
That would make way too much sense and politicians and developers can't run the grift that gets them paid if there isn't an overabundance of complexity built-in to any "public" works project.
I hate everything
5/31/2026 5:47:30 PM EDT
[#8]
Quote History
Originally Posted By wmagrush:
And wth Duke cutting local electric production by over 70% probably increased electric bills for residents as OP mentioned. Duke’s solar panel farm isn’t going to cut it, but somehow they will be tied into it getting more govt subsidies.

There is a ‘12 month temporary hold’ by the county commission to review the planned site.

And the St Pete Times link (original liberal newspaper’s name) wants money to read the article.
View Quote

I have a feeling that the 12 months will be used to get past the first Tuesday in November, then the balance will be used to figure how to launder the bribe money.
6/19/2026 4:58:03 PM EDT
[Last Edit: SystemFailCoreDump][Edited] [#9]
There's a petition to ask the Nassau County Commission to stop planned datacenters there now.


Linky: Ban Datacenters in Nassua County Petition


6/19/2026 6:41:06 PM EDT
[#10]
Quote History
Originally Posted By SystemFailCoreDump:
There's a petition to ask the Nassau County Commission to stop planned datacenters there now.


Linky: Ban Datacenters in Nassua County Petition


View Quote
Change.Org is a fart in the wind and ignored by government.
6/20/2026 8:49:24 AM EDT
[#11]
Kind of figured that but it's the only reference I have. At the bottom of the page at the link are the names of the commission members.
6/20/2026 9:04:57 AM EDT
[#12]
There's also a proposed data center in DeSoto county at a former natural gas power plant that could eventually encompass 800 acres.  

Proposed Data Center


Now with more political fatigue.
6/24/2026 10:57:21 AM EDT
[#13]
Good news.  The Deltona Corp has withdrawn its application for a zoning change to accommodate their proposed data center in Citrus County.  We're safe.....for now.
6/24/2026 11:19:49 AM EDT
[#14]
Quote History
Originally Posted By Kalashnikov762:
Good news.  The Deltona Corp has withdrawn its application for a zoning change to accommodate their proposed data center in Citrus County.  We're safe.....for now.
View Quote
It'll just be another HOA.